blog

Embedded World Nuremberg Exhibition Guide for Exhibitors

26 November 2026 · By Adil · Last updated 26 November 2026

In this article · 6 sections
  1. Embedded World 2027 at a glance
  2. Why Nuremberg and NuernbergMesse
  3. What exhibitors should plan
  4. Make the most of the show floor
  5. Working with a local contractor
  6. Next step

The next Embedded World Exhibition & Conference takes place from 16 to 18 March 2027 at the Exhibition Centre Nuremberg (NuernbergMesse), and it will be the 25th edition. If you plan to exhibit, the stand decisions that matter most are made months earlier: your hall and floor plan, the organiser's technical regulations, and how your build is scheduled. This guide covers the verified facts about the show and what to plan for as an exhibitor.

01

Embedded World 2027 at a glance

  • Dates: Tuesday 16 March to Thursday 18 March 2027.
  • Venue: NuernbergMesse, Messezentrum 1, 90471 Nuremberg, Germany.
  • Opening hours: 09:00 to 18:00 on 16 and 17 March, and 09:00 to 17:00 on 18 March.
  • Edition: the 25th Embedded World Exhibition & Conference, as stated by the organiser.
  • Scale of the previous edition: the organiser's closing report for 2026 gives about 36,000 visitors from almost 90 countries, an increase of more than 13% on the year before.

Embedded World is the international trade fair for embedded systems, and it runs alongside a conference programme. It covers the technology used in products such as industrial automation equipment, automotive electronics and connected devices, which is why exhibitors range from chip and module makers to software, tools and service companies. Check the organiser's website for the current exhibitor list and topic areas, as these change every year.

02

Why Nuremberg and NuernbergMesse

Nuremberg is where the show has been held for years, and NuernbergMesse is an established trade fair venue with its own exhibitor services, technical regulations and appointed build-up procedures. For exhibitors this means rules are formal and documented. Treat the documents as part of the project, not an afterthought.

03

What exhibitors should plan

1. Choose your space and hall early

The organiser publishes technical floor plans for each edition, with hall overviews and legends. Use them to see where your area sits relative to entrances, catering, conference rooms and the main aisles. For a technology show where visitors come with specific meetings in mind, location matters less than making sure your target audience can find you, so put your stand number in every invitation.

The 2027 hall allocation is not covered here. Check the current floor plan and your space confirmation from the organiser for the final hall and stand number.

2. Read the technical regulations before you design

NuernbergMesse publishes technical regulations covering the halls and outdoor areas, and the Embedded World exhibitor pages link to stand construction rules and a technical floor plan. These documents typically govern the points that shape your design:

  • construction and ceiling heights within your stand area
  • building over or above stand areas and safety clearances
  • fire protection and approved materials
  • electrical connections and power supply
  • hanging points and rigging
  • permission requirements for two-storey or large structures

Always take the exact limits from the current NuernbergMesse regulations and the exhibitor documents for 2027, not from a previous year's drawing or a general rule of thumb. Your stand builder should design from them and submit any drawings the organiser requires.

3. Pick the stand type that matches your goal

Embedded World visitors are mostly engineers and technical buyers who want to see hardware, ask specific questions and arrange follow-up. That affects the design:

  • Give products room for working demos, with power, network access and screens planned in advance.
  • Create a quiet meeting area, because technical conversations take time. Consider a closed or semi-closed room.
  • Keep graphics clear: product category, key technologies and your stand number visible from the aisle.
  • Plan storage for samples, boards and demo hardware.

Compare options in our guide to the different types of exhibition stands. If you are a smaller company, a modular or rental system can meet the brief with less lead time. See our booth rental service. For larger brands, a custom booth allows demos and meeting rooms to be designed around the product.

4. Plan build-up, dismantling and logistics

Build-up and dismantling at German fairs follow a schedule set by the organiser, and access to the hall is controlled. The exact times for 2027 are published in the exhibitor documentation, so they are not stated here. Plan around these:

  • Confirm build-up and dismantling dates and vehicle access with the organiser.
  • Allow transport time if your equipment is coming from outside the EU, including customs paperwork for demonstration hardware.
  • Order electricity, internet and any water or compressed air services through the organiser's service portal by their deadlines.
  • Agree who is on site when your stand is installed and who signs off the handover.

For equipment crossing borders, transportation and logistics planning should start as soon as you know the stand design. Our installation and dismantle service covers the on-site build.

5. Build a realistic timeline

A custom stand needs time for design, 3D approval, organiser review, production and shipping. As a working rule, start the brief at least three to four months before the show, and earlier for a large or two-storey stand. For a 16 March 2027 opening, that points to autumn of the previous year. Confirm any organiser submission deadlines from your exhibitor documents.

04

Make the most of the show floor

  • Book meetings in advance. Contact existing customers and prospects before the show with your hall and stand number.
  • Use the conference. Exhibitors that speak in or attend sessions get more visibility with the audience that is already there.
  • Prepare demos that work offline. Show floors can have crowded networks, so have fallback content.
  • Brief the team. Engineers on the stand should be ready to explain technical details and to qualify the enquiry.
  • Follow up quickly. Contact leads within a few days and send the data sheets you promised. Our guide to common exhibiting mistakes covers this in more detail.
05

Working with a local contractor

NuernbergMesse has its own regulations and services, and a builder who knows the venue can handle the organiser paperwork and installation. See our page for exhibition stand contractors in Nuremberg, or the wider exhibition stand builders in Germany page, and browse other fairs on our top exhibitions in Germany calendar.

06

Next step

If you have a space booked or are considering Embedded World 2027, send the stand size, hall plan and your goals through our quote request page. We will propose a layout and concept, and itemise design, production, logistics and installation.

Ready to stand out at your next show?

Send your show name and stand size — we reply within 24 hours, and an itemised quotation with a free 3D concept usually within 48–72 hours of a complete brief.

On Instagram

Our latest builds, as reels

Follow @stands_bay